Blog
- International Sales Hotline: 0086-371-63398802
Three Level Maintenance of Poultry Slaughtering Equipment
Three Level Maintenance of Poultry Slaughtering Equipment
First level maintenance
The basic of primary care is a regular check, once a week, supplemented by maintenance of an indirect preventive maintenance of the form. The main work of the paper is: check, cleaning, adjustment automatic line transmission mechanism, conveying belt parts; check the pump, dredging oil, fuel tank check the oil, the amount of oil; removal of burr in the face of the; check and adjust the various indicators and safety protection device; find fault hidden trouble and abnormal to be excluded, and eliminate the leakage phenomenon. Equipment after maintenance requirements reached: look clean and bright; smooth circuit, oil window clean bright; flexible operation, normal operation; electrical safety protection, indicating instrument complete and reliable. Maintenance personnel should be the main content of maintenance, maintenance process and the hidden dangers of the exclusion, abnormal, test run results, production parts accuracy, performance, etc., as well as the existence of the problem to record. Level maintenance to operator, professional maintenance personnel (benchwork, refrigeration industry, maintenance electrician) with guidance.
Second level maintenance
The second maintenance is generally carried out on a monthly basis, mainly for wear and damage to the equipment wear and tear parts for repair or replacement. 2nd level maintenance to finish all the work of the maintenance, also requires lubricating parts cleaning all, combined with oil change cycle check the lubricating oil, cleaning oil. Facility review of static skill and secondary precision (noise, shock, temperature, oil pressure, the ripple, the nominal coarse degree), transfer equipment, change or repair parts, scraping and grinding wear of rail movement, repair mobilize precision has inferior position, check machine mounted gauge, repair insurance installation, cleaning or replacement of the generator bearing, measuring insulation resistance and so on. After the secondary cozy request precision and function reach the process requirements, without leakage, breathable, leakage scene, sound, shock, pressure, temperature, etc. consistent with norms. Two level maintenance facilities always response theory, suggest default skills and static, carefully run maintenance records. Two level maintenance personnel to spare (automotive industry, electrical fitter, refrigeration maintenance), join operator.
Third level maintenance
The third level maintenance is to annually the need for one to two times the comprehensive inspection and facilities of the zero element wear condition, function, precision deterioration level and fault occur the can of, is August and the festival period application consumption season, each branch according to the facilities of the situation develop facilities of the renamed Peixiu form and scheme, change parts and accessories, table scheme and Peixiu expense budget on the basis of that report to the company to establish inspection summary by the consent of the total operating purposes, Peixiu forms include heavily in the form of secondary cozy and maintenance required to stop production facilities. Facilities maintenance records submitted to the company set up heavily form record filing.